How we build
Six stages, no surprises
The same team designs and builds, so every promise made on paper is kept on site. Here is exactly what happens, how long it takes, and what you hold in your hands at each stage.
- 01
Site study & brief
1–2 weeksEvery home starts with a site study. We measure the plot, study the sun path and the street, check municipal bylaws, and listen to how your family actually lives.
You receive
- Measured site document with orientation, access and bylaws
- Written brief capturing your budget band, must-haves and non-negotiables
- 02
Concept design
3–5 weeksWe turn the brief into plans you can walk through. Heritage devices — courtyards, verandas, jaali — are used where they do real work, not as decoration.
You receive
- Two to three concept options with plans and 3D views
- A rough cost range per option so you can choose with numbers, not hope
- 03
Drawings, estimates & permissions
3–6 weeksOne agreed concept becomes a complete drawing set. We file for municipal sanction and freeze the scope, so site work starts without surprises.
You receive
- Sanction-ready drawing set (plans, elevations, sections)
- Itemised construction estimate and a construction timeline
- 04
Structure & construction
8–14 monthsEngineering you never see, done right. Our vetted civil, plumbing and electrical teams build under one site manager, with quality checks at every slab and finish.
You receive
- Weekly progress photos and a stage-wise cost report
- A site you can visit any day — our own teams, not passing subcontractors
- 05
Interiors & fit-out
2–5 months (overlaps)The same team that built your walls dresses them. Layout, lighting, furniture and decor are handled turnkey, so nothing is left half-finished at handover.
You receive
- Material and finish boards signed off before anything is ordered
- Custom furniture and joinery built by our carpentry team
- 06
Handover & after
Handover day + 12 monthsMachines drive off, lights turn on, your family walks in. We hand over documentation most builders never provide — and we stay reachable after.
You receive
- Snag-free handover with as-built drawings, warranties and a maintenance manual
- One year of post-handover support for every snag, big or small